How to prepare the gas analyzer for work?
Content
Some gas analyzers are supplied pre-filled with tracer liquid. However, some models require that the U-tube of the gauge be filled with gauge fluid or water. | ||
How to fill the U-tube of your pressure gauge | ||
Step 1- Remove the protective capRemove the protective cap from the top of the U-tube. | ||
Step 2 - Fill the U-tube with indicator liquidCarefully pour the selected indicator liquid into the U-tube until the liquid level reaches 0 mbar on the scale. | ||
Step 3 - Zero GaugeAdjust the scale by moving it up or down with the zero adjuster until the liquid levels on both tube feet are exactly aligned with the 0 graduation. Your gas analyzer is now ready for use. |
Posted
in